![]() ![]() This multi-million dollar effort improves Pittsburgh’s street and sidewalk quality throughout PWSA’s service area as a result of this underground work.Ī total of eight Sidewalk and Street Restoration site locations have been identified in Downtown Pittsburgh and work will begin in spring 2022 (exact date TBA) and will continue through the summer. Multiple Downtown Site Locations to Undergo Final Phase of PWSA’s Sidewalk and Street Restoration Project in Spring and Summer 2022įollowing the completion of a water or sewer repair, PWSA must return to the site to repave or re-concrete the area impacted. Wednesday morning as crews conduct electrical and lighting work. PennDOT District 11 is announcing a lane restriction in the inbound (eastbound) Fort Pitt Tunnel in the City of Pittsburgh, Allegheny County, will occur Tuesday night, September 27.Ī single-lane restriction will occur in the inbound Fort Pitt Tunnel from 9:30 p.m. Turn right onto the I-70 westbound entrance ramp.Overnight Single-Lane Restriction in Inbound Fort Pitt Tunnel on September 27.Make left turns onto northbound Route 88 and then First Street and Twilight Hollow Road.Take the exit for Charleroi/Allenport (Exit 40).Cross Maple Drive onto the I-70 eastbound entrance ramp.The new bridge will have a clearance of 16.5 feet.ĭuring the Speers closures, eastbound I-70 traffic will: PennDOT is working to replace the bridge with a new span that will have an increased clearance over the interstate.Īccording to PennDOT, the bridge’s bottom beams, with a clearance of 14.3 feet, have been struck periodically by tall vehicles on the interstate. The closures are needed during demolition of a section of a bridge that carries Maple Drive over the interstate. They originally were scheduled for Monday and Tuesday. The closures, with related detours, were postponed until 8 p.m. PennDOT also is replacing four bridges on that section of the interstate.Ī section of the interstate will be closed overnight twice in both directions, near the Speers exit in Washington County. ![]() ![]() The work will widen the roadway to include a 10-foot-wide median and 12-foot-wide outside shoulders - along with an eastbound auxiliary lane between the two interchanges. The work in South Huntingdon, which is dependent on favorable weather conditions, is part of an estimated $92.8 million project to improve the Yukon and Madison interchanges and to reconstruct 3.7 miles of the interstate. PennDOT officials said the restriction will be in place while traffic is shifted to newly completed lanes and the outer shoulder, allowing crews from Trumbull Corporation to complete work on the median and an inside shoulder. between the exits for Route 31 and Yukon. PennDOT projects are scheduled to interrupt traffic Wednesday on Interstate 70 - at a work site near the Yukon exit in Westmoreland County and at a location farther west, in Washington County.Įastbound traffic will be restricted to a single lane from 9 a.m. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |